Composition of project documentation. Composition of design documentation for examination. Purpose of working documentation

To develop a project for new construction, reconstruction or overhaul it is required to develop design documentation. Compound project documentation is regulated by Resolution No. 87 “On the composition of sections of project documentation and requirements for their content.”

All projects can be divided into 2 categories: capital construction projects and linear facilities.

Capital construction projects include various buildings and structures that have above-ground and (or) underground parts, including premises, engineering support networks and engineering support systems and are intended for living and (or) activities of people, location of production, storage of products or keeping animals.

Capital construction projects do not include temporary buildings. Temporary buildings do not require examination at all, and therefore there are no requirements for the composition of the design documentation.

Temporary buildings and the permanent construction option have externally similar features, while, according to the Urban Planning Code of Russia, technical differences between the objects are defined:

  1. The object of capital characteristics of construction is tied to a permanent foundation, and there is always a connection to the land plot. A temporary structure may not have a foundation.
  2. A capital facility involves the collection of permits for operation in in full, while a temporary building has a minimum set of documents for permission to operate.
  3. The minimum service life for an object of category KS (capital construction) is 25 years, and can be higher than 100 years. Temporary buildings must be in use for no more than 25 years, with mandatory conditions for demolition.
  4. A capital facility cannot be demolished or moved to another location, with the exception of a number of provisions of the town planning code.
  5. The object of completed construction work involves the use of property rights with registration in Rosreestr; for temporary buildings, restrictive permitting functions of property rights are presented.

Linear objects include: power lines, communication lines (including linear cable structures), pipelines, car roads, railway lines, bridges, overpasses, pedestrian crossings and other similar structures.

If a linear facility contains buildings and structures that relate to capital construction, then a project for a linear structure is developed in accordance with the list of sections for a linear structure and separate designs for buildings and structures in accordance with the requirements for sections for capital construction. Section 4 of the linear facility provides a list, characteristics and provides links to building designs that are included in the infrastructure of the linear facility.

Composition of design documentation for a capital construction project:

Section 2 “Planning Organization Scheme” land plot"(ROM)

Section 3 “Architectural solutions” (AR)

Section 4 “Constructive and space-planning solutions” (KR)

Section 5 “Information about engineering equipment, about networks of engineering and technical support, list of engineering and technical activities, content of technological solutions"

This section consists of subsections:

a) subsection “Power supply system” (IOS1);

b) subsection “Water supply system” (IOS2);

c) subsection “Water disposal system” (IOS3);

d) subsection “Heating, ventilation and air conditioning, heating network"(IOS4);

e) subsection “Communication networks” (IOS5);

f) subsection “Gas supply system” (IOS6);

g) subsection “Technological solutions” (IOS7).

Section 6 “Construction Organization Project” (POS)

Section 7 “Project for organizing work on the demolition or dismantling of capital construction projects” (POD)

Section 8 “List of security measures environment"(OOS)

Section 9 “Measures to ensure fire safety"(PB)

Section 10 “Measures to ensure access for people with disabilities” (ADI)

Section 10(1) “Measures to ensure compliance with energy efficiency requirements and requirements for equipping buildings, structures and structures with metering devices for energy resources used” (EE)

Section 11 “Estimate for the construction of capital construction projects” (SM)

Section 12 “Other documentation in cases provided for by federal laws”

Composition of design documentation for linear objects:

Section 1 " Explanatory note"(PZ)

Section 2 “Right-of-way design” (RW)

Section 3 “Technological and design solutions for a linear facility. Artificial structures" (TKR)

Section 4 “Buildings, structures and structures included in the infrastructure of a linear facility” (ILO)

Section 5 “Construction Organization Project” (POS)

Section 6 “Project for organizing work on the demolition (dismantling) of a linear facility” (POD)

Section 7 “Environmental Protection Measures” (EPM)

Section 8 “Measures to ensure fire safety” (FS)

Section 9 “Estimate for construction” (CM)

Section 10 “Other documentation in cases provided for by federal laws”

If one of the sections is not being developed, then this section is still written as part of the project, but we add the inscription “Not being developed” in the note. The numbering of sections does not change.

For example, Section 7 “Project for organizing work on demolition or dismantling of capital construction projects” is not always required and we do not develop it, but the numbering of sections does not change because of this, the following section Section 8 “List of environmental protection measures” will remain section 8.

A section may have subsections, for example, as in section 5. In large projects, subsections may also be divided into parts. The parts are divided into books.

2345-IOS4.1.1 - Section 5. Information about engineering equipment, engineering support networks, list of engineering activities, content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 1. Basic solutions.

2345-IOS4.1.2 - Section 5. Information about engineering equipment, about networks of engineering support, a list of engineering activities, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 2. Automation systems for heating, ventilation and air conditioning

Each section, subsection, part and, if necessary, book included in the volume, as well as each text and graphic document included in the volume, is assigned an independent designation, which is indicated on the cover, title page and/or in the title block, as well as in the headers and footers text documents, performed without main inscriptions.

The section “Other documentation in cases provided for by federal laws” contains sections that are not included in the main list, but are necessary in the project, for example:

  • Declaration of Industrial Safety of Hazardous Production Facilities (DS HIF);
  • List of measures for civil defense, measures to prevent emergencies of a natural and man-made nature (CES)
  • Technological regulations for waste management
  • Security and protective deratization system (OPDS)
  • Transport security
  • Survey reports

and other sections that are provided for by federal laws or design assignments from the Customer.

All documents are assigned their own code, according to the system in force in the design organization. The code includes, for example, the number of the agreement (contract) and/or the code of the construction site (numeric, alphabetic or alphanumeric). The basic designation may include other codes used in CAD and EDMS.

If a section is divided into parts, then the part designation is made up of the section designation, to which the part number is added

2345-PZ - Section 1. Explanatory note.

2345-PZU1 - Section 2. Scheme of planning organization of the land plot. Part 1. General information.

2345-PZU2 - Section 2. Scheme of planning organization of a land plot. Part 2. Internal decisions railway transport. If a part is divided into books, then the book designation is made up of the part designation, to which the book number is added through a dot.

Requirements for design documentation are set out in GOST R 21.1101-2013 SPDS. Basic requirements for design and working documentation

Volumes are completed in the following order:

— cover;

- title page;

— statement “Composition of design documentation” (It is allowed not to include the statement “Composition of design documentation” in each volume, but complete it separate volume);

— text part;

— graphic part (drawings and diagrams).

The number of sheets included in the volume is determined from the need to ensure ease of use, as a rule, no more than 300 sheets of A4 format according to GOST 2.301 or an equivalent number of sheets of other formats.

The title page is made according to form 12 (Appendix N GOST R 21.1101-2013).

The following details are provided on the cover:

— field 5 — name of the capital construction project and, if necessary, type of construction. The name of the construction project on the cover must correspond to the information given in columns 2 and 3 of the main inscription (see Appendix G);

— field 9 — volume number according to the statement “Composition of design documentation” or “Composition of reporting documentation based on the results of engineering surveys” (if available);

— field 10 — year of document issue;

— field 11 — to place the table for registering changes in Form 11 of Appendix M (if necessary).

The title page is made according to form 13 (Appendix P GOST R 21.1101-2013).

The following details are provided on the title page:

— field 1 — abbreviated, and in its absence — the full name of the parent organization (if any); are usually indicated for government organizations;

— field 2 — logo (optional), full name of the organization that prepared the document;

— field 3 — number and date of issue of the certificate of admission to the relevant types of work (preparing design documentation or conducting surveys) that affect the safety of the capital construction project;

— field 4 — short name of the customer organization (if necessary). The name is indicated in the form: “Customer - name of the customer organization”;

— field 5 — name of the capital construction project and, if necessary, type of construction. The name of the construction project on the title page must correspond to the information given in columns 2 and 3 of the main inscription (see Appendix G);

— field 6 — type of documentation (if necessary);

— field 7 — name of the document;

— field 8 — document designation;

— field 9 — volume number according to the statement “Composition of design documentation” or “Composition of reporting documentation for engineering surveys” (if available);

— field 10 — positions of persons responsible for developing the document;

— field 11 — signatures of the persons indicated in field 10, performed in accordance with GOST R 6.30. This field is also affixed with the certifying seal of the organization that prepared the document;

— field 12 — initials and surnames of the persons indicated in field 10;

— field 13 — year of document issue;

— field 14 — to place the table for registering changes in Form 11 of Appendix M (if necessary);

— field 15 — for additional columns of the title block in accordance with Appendix G. The information contained in these columns may be provided in another form in accordance with the requirements established in the organization’s standards.

The title can also be in A3 format if the document itself has such a format.

Cost calculation

List of sections of design documentation for capital construction projects for industrial and non-industrial purposes

(residential buildings, warehouses, administrative buildings, shopping centers, business centers, etc.)

GPZU

Lease contract

Cadastral plan

Land contract

Specifications

SRO of designers

Project documentation

1. Explanatory note

2. Scheme of planning organization of the land plot

3.Architectural solutions

4.Constructive and space-planning solutions

5. Information about engineering equipment, engineering support networks, list of engineering activities, content of technological solutions

5.1. Power supply system

5.2. Water supply system

5.3. Drainage system

5.4. Heating, ventilation and air conditioning, heating networks

5.5. Communication networks

5.6. Gas supply system

5.7. Technological solutions

6. Construction organization project

7. Project for organizing work on the demolition or dismantling of capital construction objects" (carried out if it is necessary to demolish (dismantle) an object or part of a capital construction object)

8.List of environmental protection measures

9.Measures to ensure fire safety

10.Measures to ensure access for people with disabilities

10(1).Measures to ensure compliance with energy efficiency requirements and requirements for equipping buildings, structures and structures with metering devices for energy resources used

11. Estimates for the construction of capital construction projects

12.Other documentation in cases provided for by federal laws

12.1. Safe operation of buildings and structures

12.2. Civil Defense and Emergency

12.3. Anti-terrorism measures

12.4. Traffic organization

Engineering-geological

Engineering and geodetic

Engineering and environmental

List of sections of design documentation for linear capital construction projects

(gas pipelines, water pumping units, electricity networks, etc.)

Initial permitting documentation

GPZU

Lease contract

Cadastral plan

Land contract

Specifications

SRO of designers

Project documentation

1. Explanatory note

2. Right-of-way design

3.Technological and design solutions for a linear facility. Artificial constructions

4.Buildings, structures and structures included in the infrastructure of a linear facility

5. Construction organization project

6. Project for organizing the demolition (dismantling) of a linear facility

7.Environmental protection measures

8.Measures to ensure fire safety

9.Estimate for construction

10.Other documentation in cases provided for by federal laws


Documents based on the results of engineering surveys

Engineering-geological

Engineering and geodetic

Engineering and environmental

Cost calculation

The implementation of construction projects requires the development of special documentation, in accordance with which the work of specialists must be carried out. Its structure, as well as the approval procedure, are determined by law - at the level of federal regulations. Main element the corresponding set of sources - project documentation. In some cases, it can be supplemented by a working one, as well as technical specifications. What are the features of developing design documentation in construction? What are the main sources of law governing its application?

What is project documentation?

Project documentation (or design estimates) is usually understood as a set of sources, which may include both text and graphic materials intended to determine lists of architectural, technological, structural, and engineering solutions used as part of the implementation of a construction project.

Depending on the complexity of the tasks facing the company, the structure of the relevant documentation may vary. Its composition determines which specific specialists will be involved in the development of these sources.

The role of design documentation in construction

Other documents, the inclusion of which in the design and estimate documentation is required by law.

It can be noted that the section reflecting information about engineering infrastructure includes several subsections, namely sources disclosing data on water supply, sanitation, heating, ventilation, air conditioning, gas supply, and communications.

Also in the structure of the section under consideration there should be a subsection that provides information about technological solutions. It is worth noting that, in accordance with the Town Planning Code, correctly drawn up project documentation includes sections presented in a slightly different structure. In particular, it involves the inclusion in the sources under consideration of a section reflecting information on ensuring the required level safe operation construction projects, which, in turn, is not provided for by Resolution No. 87.

If the design documentation requires the inclusion of other sections that are not defined as mandatory elements in the legislation, then their list is fixed in agreements between the developer of the relevant sources and the customer. It may be noted that some of those sections of documentation that are defined by law must be included in it only if the construction project is being implemented at the expense of budgetary organizations. Their specific list is given in Resolution No. 87.

Can it be compiled for individual stages of implementation? construction work project documentation? The documentation and the project described in it can indeed be considered in the context of specific periods of implementation of the construction plan. In this case, the need to develop separate group sources for each stage are recorded in the task for creating the project. Wherein this procedure subject to justification by special calculations that confirm the possibility practical implementation certain design decisions within the framework of the implementation of a construction project in stages.

In addition, the documentation used in specific periods of construction is developed to the established extent. Its structure in terms of basic elements, as well as the presence of sections, must comply with the requirements established in Resolution No. 87.

Purpose of working documentation

So, we have looked at what high-quality project documentation includes, as well as its main features. However, in practice, this set of sources for the purpose of regulating construction work is, as a rule, also supplemented by another type of documentation - working documentation. It will be useful to study its features.

It may be noted that Regulation No. 87 does not clearly regulate the order in which the working component of sources for project implementation should be developed. The relevant legal act establishes that it, like project documentation, includes both text and graphic documents. For example, drawings, various specifications.

In principle, design and working documentation can be created simultaneously. Composition and structure of the second in general case are determined by the customer or developer depending on the details of certain solutions given in the project documentation. The corresponding parameters can be recorded in the task sent to the developer of the sources in question.

The main elements of working documentation are drawings, specifications and other documents supplementing them. On their basis, the implementation of those solutions provided for by the project is carried out.

Technical specifications as part of construction documentation

Next most important type sources that can complement the design documentation - technical specifications. It will be useful to consider their specifics. To a certain extent, the application of technical conditions is also regulated by Resolution No. 87. Thus, in the relevant legal act it is indicated that they are developed and approved if:

The implementation of design documentation requires a larger list of requirements reflecting the reliability and safety of structures, relative to the list established by regulations;

The corresponding requirements are not defined in regulations.

Technical specifications must be developed in accordance with the procedure established by law. In practice, it is determined by the competent department - the Ministry of Construction and Housing and Communal Services of the Russian Federation in agreement with others federal authorities RF.

Thus, project documentation includes working documentation in cases provided for by law, as well as in the presence of certain agreements between the customer and the developer of the relevant sources. In some cases, it is supplemented by technical conditions, which are also created in the manner determined by the legislator.

Structure of project documentation according to Resolution No. 87

In accordance with the provisions of Decree No. 87, the preparation of project documentation involves the inclusion of text and graphic elements. The first should reflect:

Information about the construction site;

Descriptions various solutions, in particular technical;

Calculations that justify the decisions made during the development of the project.

The graphic part of the project documentation clearly displays the corresponding solutions. For this the following can be used:

Blueprints;

Graphic diagrams;

Others Required documents presented in graphical form.

The preparation of project documentation as part of the acquisition of both types of elements, both textual and graphic, must be carried out in compliance with the requirements of the legislation on state secret. The way in which certain elements of the documentation under consideration should be drawn up is regulated by the standards established by the Ministry of Construction and Housing and Communal Services of the Russian Federation.

Documentation examination

So, we have looked at what design and estimate documentation includes, in accordance with what legal norms it is drawn up. It will also be useful to study one of the most important aspects its application is conducting state examination of these sources.

The procedure under consideration is carried out with the aim of creating construction projects in accordance with the requirements of the legislation in force in various fields, including those aimed at ensuring the observance of the rights of citizens and organizations in various legal relations. Design and estimate documentation must undergo examination in accordance with the Town Planning Code of the Russian Federation, as well as Federal law No. 337, adopted on November 28, 2011. The corresponding procedure is carried out by the competent government authorities.

However, in preparation for it construction firm can turn to the services of private structures that can provide support for the examination, about which we're talking about. What is the essence of this service?

Support of state examination of construction documentation

Support for the examination of project documentation most often includes:

Conducting a non-state examination in accordance with criteria generally consistent with those used by the competent authorities;

Audit of specific sections of documentation to identify deficiencies in them and determine the degree of compliance established requirements legislation;

Preparation of necessary materials for the purpose of transferring documents to the state body that conducts the examination.

Many companies also offer their customers advisory support directly during their interaction with departments that conduct state examination of documentation. Experts recommend contacting companies that are ready to provide both legal, organizational, and consulting support for the procedure for developing project documentation. In all the noted aspects, the assistance of experienced specialists can be useful for an enterprise implementing a construction project.

Let's consider all stages of the project in order:

  • Stage 2 - PD. Design documentation

Stage 1 - PP. Pre-design studies (Sketch design)

At this stage, the concept of the future facility is being developed and the main technical and economic characteristics are being determined. The sketch determines the planting of the object on the ground, its volumetric-spatial solution, and structural diagram. Also at this stage, the main engineering loads for water, heat and electricity are calculated, the so-called. calculation of loads.

Development Stages of "PP" is not mandatory, but helps save time and money during further design.

Stage 2 - PD. Project documentation

Unlike the preliminary design Stage "Project"(“PD” or simply “P”) is mandatory and subject to agreement in government agencies executive power. Based on the results of the approval of the “Project” Stage, a permit for the construction of the facility is issued. The composition and content of this stage is regulated by Decree of the Government of the Russian Federation No. 87 of February 16, 2008. Of course, the composition will be individual for each project, but we will try to compose the most full list everyone possible sections and subsections of the “PD” Stage:

Number Section code Section title
Section 1 Explanatory note
Volume 1 - HMO Explanatory note
Volume 2 - IRD Initial permitting documentation
Section 2 - ROM Scheme of planning organization of a land plot
Section 3 - AR Architectural solutions
Section 4 Constructive and space-planning solutions
Volume 1 - KR1 Reinforced concrete structures
Volume 2 - KR2 Metal constructions
Volume 3 - KR3 Wooden structures
Volume 4 - KRR Static calculation
Section 5 Information about engineering equipment, engineering support networks, a list of engineering activities, the content of technological solutions.
Subsection 1 Power supply system
Volume 1 - IOS1.1 Outdoor power supply
Volume 2 - IOS1.2 Power equipment
Volume 3 - IOS1.3 Electric lighting
Subsection 2 Water supply system
Volume 1 - IOS2.1 External water supply
Volume 2 - IOS2.2 Domestic water supply
Subsection 3 Drainage system
Volume 1 - IOS3.1 External drainage
Volume 2 - IOS3.2 Internal drainage
Subsection 4 Heating, ventilation and air conditioning, heating networks
Volume 1 - IOS4.1 Heating and ventilation
Volume 2 - IOS4.2 Heat supply
Volume 3 - IOS4.3 Individual heating point
Subsection 5 Communication networks
Volume 1 - IOS5.1
Volume 2 - IOS5.2
Volume 3 - IOS5.3
Volume 4 - iOS5.4 CCTV
Volume 5 - iOS5.5 Security alarm
Volume 6 - IOS5.6
Volume 7 - iOS5.7 Other low current systems
Subsection 6 Gas supply system
Volume 1 - IOS6.1 Outdoor gas supply
Volume 2 - IOS6.2 Domestic gas supply
Subsection 7 Technological solutions
Volume 1 - IOS7.1 Technological solutions
Volume 2 - IOS7.2
Volume 3 - IOS7.3 Air supply
Volume 4 - IOS7.4 Refrigeration
Volume 5 - IOS7.5 Steam supply
Volume 6 - IOS7.6 Dust removal
Volume 7 - IOS7.7 Other technological systems
Section 6 - POS Construction organization project
Section 7 - UNDER Project for organizing work on demolition or dismantling of capital construction projects
Section 8
Volume 1 - OOC List of environmental protection measures
Volume 2 - OOS.TR Draft technological regulations for the management of construction waste at the site
Volume 3 - IEI Engineering and environmental surveys
Section 9
Volume 1 - PB1 Fire safety measures
Volume 2 - PB2
Volume 3 - PB3
Volume 4 - PB4
Section 10 - ODI Measures to ensure access for people with disabilities
Section 10(1) - ME Measures to ensure compliance with energy efficiency requirements
and equipment requirements for buildings, structures and structures
metering devices for used energy resources
Section 11
Volume 1 - SM1 Estimates for the construction of capital construction projects
Volume 2 - SM2 Monitoring prices for materials
Section 12 Other documentation in cases provided for by Federal laws
Volume 1 - KEO Lighting calculations of insolation and natural illumination (KEO)
Volume 2 - ZSH Measures to protect against noise and vibration.
Assessment of noise impact for the period of operation of the facility
Volume 3 - ITM GOiChS Engineering and technical measures of civil defense.
Measures to prevent emergency situations
Volume 4 - ED Building Operating Instructions
Volume 5 - PTA Measures to counter terrorist acts
Volume 6 - DPB Declaration of industrial safety of hazardous production facilities

Stage 3 - RD. Working documentation

Stage "RD" is needed primarily by builders, since it develops the most complete and detailed design solutions, which were only indicated in the “PD” Stage. Unlike "P", "Rabochka" includes drawings of components, axonometric diagrams and profiles utility networks, specifications, etc. On the other hand, at the working stage, the documentation is deprived of some sections, the completeness of which was exhausted at the design stage (for example, PIC, Environmental Protection, KEO, ITM GOiES, etc.). As at Stage “P”, the composition of the “Working Documents” will be individual for each project, but we will try to compile the most complete list of all possible sections of the “Working Documentation” Stage:

Section code Section title
- GP General plan
- TR Transport structures
- GT General plan and transport (when merging GP and TR)
- blood pressure Car roads
- RV Railways
- AR Architectural solutions
- AC Architectural and construction solutions (when combining AR and KR)
- AI Interiors
- QOL Constructive decisions. Reinforced concrete structures
- KJ0 Constructive decisions. Reinforced concrete structures. Foundations
- KM Constructive decisions. Metal constructions
- KMD Constructive decisions. Metal structures detailing
- KD Constructive decisions. Wooden structures
- KRR Constructive decisions. Static calculation
- GR Hydraulic solutions
- ES Power supply system. Outdoor power supply
- EM Power supply system. Power equipment
- EO Power supply system. Electric lighting
- EN Power supply system. Outdoor electric lighting
- EIS Power supply for engineering systems
- NV Water supply system. External networks
- NK Drainage system. External networks
- NVK Water supply and drainage system. External networks
- VC Water supply and drainage system. Internal networks
- HVAC Heating, ventilation and air conditioning
- TS Heat supply
- TM Thermomechanical solutions (Boiler room, ITP, etc.)
- RT Telephony, Radio, Telereception
- SKS Structured Cabling Networks
- AIS Automation of engineering systems
- ATP Automation of technological processes
- AK Complex automation (when combining AIS and ATP)
- VN CCTV
- OS Security alarm
- ACS Access control and accounting system
- GOS Outdoor gas supply
- FGP Domestic gas supply
- TX Technological solutions
- TK Technological communications
- Sun Air supply
- HS Refrigeration
- PS Steam supply
- PU Dust removal
- AUPS
- SOUE
Automatic fire alarm installation,
Fire warning and evacuation control system
- APPZ Automatic fire protection
- PT Special fire extinguishing (water, powder, etc.)
- T1DM Estimates for the construction of capital construction projects
- T2DM Monitoring prices for materials
- AZ Anti-corrosion protection
- TI Thermal insulation of equipment and pipelines

GOST R 21.1101-2013 Design documentation system:

4.2. Working documentation
4.2.1. The working documentation transferred to the customer includes:
- working drawings intended for the production of construction and installation work;
- attached documents developed in addition to the working drawings of the main set.
4.2.2. The main sets of working drawings include general data on working drawings, drawings and diagrams provided for by the relevant standards of the Design Documentation System for Construction (hereinafter referred to as SPDS).
...
4.2.6. The attached documents include:
- working documentation for construction products;
- sketch drawings common types non-standard products, manufactured in accordance with GOST 21.114;
- specification of equipment, products and materials, carried out in accordance with GOST 21.110;
- questionnaires and dimensional drawings made in accordance with the data of the equipment manufacturers;
- local estimate according to forms;
- other documents provided for by the relevant SPDS standards.
The specific composition of the attached documents and the need for their implementation are established by the relevant SPDS standards and the design assignment.
...
4.2.8. In working drawings it is allowed to use standard building structures, products and assemblies by referring to documents containing working drawings of these structures and products. Reference documents include:
- drawings of standard structures, products and components;
- standards, which include drawings intended for the manufacture of products.
Reference documents are not included in the working documentation transferred to the customer. Project organization, if necessary, transfers them to the customer under a separate agreement.

SNiP 11-01-95 Composition of working documentation:

5.1. The composition of working documentation for the construction of enterprises, buildings and structures is determined by the relevant state standards SPDS and is specified by the customer and the designer in the design agreement (contract).

5.2. State, industry and republican standards, as well as drawings of standard structures, products and assemblies, which are referenced in the working drawings, are not included in the working documentation and can be transferred by the designer to the customer if this is stipulated in the contract.